Skip to main content
Industry Solutions

Custom Software for Advanced Manufacturing

Secure, flexible, and compliant architecture tailored for the unique challenges of the Advanced Manufacturing sector.

Founder & Lead Architect, ERPStack

Quick Answer

In short: a manufacturing ERP lives on the ISA-95 Level 3/4 boundary. ERPStack builds it custom: multi-level BOM with engineering-change effectivity, EDI 850, 856 and 862 to the OEM, IATF 16949 PPAP evidence assembled from production data, and CBAM embedded-emissions figures — on PostgreSQL, in your own cloud account.

Why Custom ERP for Advanced Manufacturing?

Manufacturing organizations require precise material requirements planning (MRP), shop floor coordination, and quality control systems. Bloated legacy systems force factories to reshape their physical assembly steps to fit rigid software code. A custom Manufacturing ERP maps directly to your assembly lines, machine schedules, and bill of materials (BOM). We integrate IoT sensors for predictive maintenance alerts, construct real-time shipping logs, and automate purchase requests. This increases shop floor yield, minimizes raw material waste, and offers complete visibility from supplier purchase orders to final product delivery.

Industry Pain Points

  • MES and ERP overlap at the ISA-95 Level 3/4 boundary — every work order keyed twice
  • Change orders that never reach the routing or the IATF 16949 control plan
  • MRP nets to infinite capacity while the real schedule sits in a spreadsheet
  • EDI 830 and 862 schedules re-keyed by hand into ERP production orders
  • PPAP evidence assembled by email — 18 elements across six systems
  • OEE read from operator logs, so it never reconciles to scrap or yield

Engineering Blueprint

Every manufacturing ERP argument is really one line: the ISA-95 boundary between Level 4 business planning and Level 3 operations. ANSI/ISA-95.00.01-2025 (IEC 62264-1) gives it a vocabulary, and ERPStack fixes it in a signed interface register before the first Drizzle ORM migration.

Level 4 ledger, Level 3 event bus

In the Purdue hierarchy ISA-95 formalises, sensors sit at Levels 0–1, PLC and SCADA at Level 2, MES at Level 3, ERP at Level 4. ERPStack keeps the manufacturing ledger in PostgreSQL and lifts production performance up as Event-Driven Architecture messages on Apache Kafka, so a work order is never keyed twice. Tags over OPC UA (IEC 62541) or MQTT Sparkplug B — namespace spBv1.0, Protocol Buffers payloads — land in TimescaleDB instead: a 1-second tag stream against a ledger write is textbook OLAP vs. OLTP Database Partitioning.

BOM revisions, never BOM updates

A multi-level bill of materials is the one manufacturing table you cannot mutate in place. ERPStack models BOM lines, routings and work centres in Drizzle ORM with effectivity dates, so an engineering change order writes a revision row and a 2019 work order still resolves to what it was built from. Scrap, yield and cost variance reconcile because the denominator never moved — an Immutable Audit Trail as a side effect.

// Drizzle ORM on PostgreSQL — BOM lines revision, never update
      export const bomLines = pgTable('bom_lines', {
        parentItem: text('parent_item').notNull(),
        childItem: text('child_item').notNull(),
        qtyPer: numeric('qty_per', { precision: 18, scale: 6 }),
        ecoNumber: text('eco_number'),            // change order
        effectiveFrom: timestamp('effective_from').notNull(),
        effectiveTo: timestamp('effective_to'),   // null = current
      });

The formats that move the goods

Automotive and aerospace supply chains do not run on REST. They run on ANSI ASC X12 — 850 Purchase Order, 830 Planning Schedule with Release Capability, 862 Shipping Schedule, 856 Ship Notice/Manifest, 810 Invoice, 997 Functional Acknowledgment — and on UN/EDIFACT DELFOR. ERPStack applies Idempotency in API Design at the interchange control number, so a re-sent 862 cannot double-book a shipment. Epicor, SAP S/4HANA, Microsoft Dynamics 365 and Odoo are genuinely strong here, and replacing them in one cut is the failure mode; the Strangler Fig Migration Pattern moves order entry first and keeps legacy MRP authoritative until the schedule reconciles.

What it costs, and when a licence beats a build

ERPStack publishes the band rather than quoting it on discovery: Standard B2B Operations at $25,000 – $60,000 over 6–8 weeks; Compliance & Multi-Tenant at $60,000 – $150,000 over 10–16 weeks; Enterprise Scale Infrastructure at $150,000 – $250,000+ over 18–24 weeks. A single-plant manufacturer with one EDI trading partner, a two-level BOM and no historian does not belong at the top of that ladder, and quite possibly does not belong on a build at all — Epicor, Dynamics 365 and Odoo ship a standard MRP module, and reproducing it in TypeScript is money spent reaching parity. The build earns its fee where the fit does not: multi-level BOM with change-order effectivity, machine data feeding OEE that has to reconcile to scrap, and enough X12 partners and shop-floor terminals that per-seat licensing starts to dominate the bill. That is a one-time fee against a licence that renews every year, and the honest comparison is over three years, not one.

Our Solutions

  • ISA-95 Level 3 event bus on Apache Kafka into a PostgreSQL Level 4 ledger
  • Multi-level BOM, routings and work centres in Drizzle ORM with change-order effectivity
  • ANSI ASC X12 850/856/810/830/862 and UN/EDIFACT DELFOR, idempotent per interchange
  • OPC UA and MQTT Sparkplug B tags in TimescaleDB, never in the transactional ERP tables
  • Next.js and TypeScript shop-floor terminals with no per-seat licence
  • PPAP packs and 8D reports generated behind an Immutable Audit Trail

Compliance & Security

IATF 16949:2016 ISO 9001:2015 ANSI/ISA-95.00.01-2025 ANSI/ISA-62443-3-3-2013 CBAM Regulation (EU) 2023/956 SOC 2 Type II

In manufacturing the audit is the condition of holding the contract. IATF 16949:2016 extends ISO 9001:2015 and cannot be certified standalone, so the quality documents are ERP requirements.

  • IATF 16949:2016 evidence, generated not assembled

    A PPAP pack carries 18 elements — design records, DFMEA, process flow, PFMEA, control plan, MSA, the Part Submission Warrant — at one of 5 submission levels. ERPStack holds the control plan and PFMEA as first-class PostgreSQL tables, so a Level 3 submission is a query. The AIAG & VDA handbook replaced RPN with Action Priority, so severity, occurrence and detection are separate columns validated by Zod.
  • 8D corrective action as an Immutable Audit Trail

    The eight disciplines D0 to D8, from Ford in 1986, are the customer’s expected format for a manufacturing supplier corrective action. ERPStack writes each as an append-only PostgreSQL row with owner and timestamp, so D4 root cause and D7 prevention stay provable two years on.
  • ANSI/ISA-62443-3-3-2013 zones and conduits

    An industrial buyer’s security team cites 62443, not a web checklist. Zones group assets at one security level — SL 1 accidental misuse through SL 4 sophisticated, well-resourced attackers — and conduits carry traffic between them. ERPStack terminates the plant conduit at a Bastion Host inside an AWS or Microsoft Azure VPC, applies RBAC per work centre, and drives ANSI/ISA-62443-4-1-2018 practice through CI/CD Deployment Pipelines gated by Semgrep SAST.
  • OEE and the 2026 product-data duties

    OEE is availability × performance × quality, a KPI defined in ISO 22400-2:2014, and ERPStack computes it in SQL from machine states so it reconciles to scrap. The same stream feeds the newer duties: CBAM (Regulation (EU) 2023/956) reached its definitive regime on 1 January 2026 for cement, iron and steel, aluminium, fertilisers, electricity and hydrogen; the ESPR (Regulation (EU) 2024/1781, in force 28 June 2024) adds the Digital Product Passport, first working plan adopted 16 April 2025; and UFLPA (Public Law 117-78) has presumed forced labour for Xinjiang-linked goods since 21 June 2022.

Standards we engineer to

  • IATF 16949:2016
  • ISO 9001:2015
  • ANSI/ISA-95.00.01-2025
  • ANSI/ISA-62443-3-3-2013
  • CBAM Regulation (EU) 2023/956
  • SOC 2 Type II

Get the Blueprint

Download our comprehensive Systems Architecture Blueprint to see how we architect compliant solutions.

Download Blueprint

Metrics & Integrations

Illustrative engineering targets for this sector — the SLAs and capacities we design and build toward, not a live service dashboard.

Apache Kafka event lag design target (ISA-95 Level 3)

< 250 ms

EDI 856 ASN turnaround design target

< 90 s

Multi-level BOM explosion design target

12 levels

TimescaleDB tag resolution design target

1 s

Integration: OPC UA (IEC 62541)

Category: Machine data

Integration: MQTT Sparkplug B

Category: Broker

Integration: ANSI ASC X12 EDI

Category: Trading partners

Integration: UN/EDIFACT DELFOR

Category: EU schedules

Integration: SAP S/4HANA

Category: Incumbent ERP

Integration: TimescaleDB

Category: Historian

Implementation Process

Phase 1

ISA-95 boundary map

A signed register of every message crossing the Level 3/4 line.

Phase 2

BOM and routing schema

Drizzle ORM tables for multi-level BOM, routings and change-order effectivity.

Phase 3

EDI conformance

850/856/810/830/862 and DELFOR maps, idempotent per interchange.

Phase 4

Machine data plane

OPC UA and Sparkplug B tags into TimescaleDB, OEE computed in SQL.

Phase 5

IATF 16949 evidence

PPAP submissions and 8D actions generated from control plan and PFMEA.

Phase 6

Strangler Fig cutover

Order entry moves first; legacy MRP stays authoritative until variance reconciles.

Proven in Advanced Manufacturing

Artisan Manufacturing ERP

Supply chain and production system for artisan manufacturing

Read Case Study

Frequently Asked Questions

At ISA-95 Level 3. ANSI/ISA-95.00.01-2025 (IEC 62264-1) puts business planning at Level 4 and manufacturing operations management at Level 3, and ERPStack fixes that line before development starts. The ERP owns the order, the cost and the PostgreSQL ledger; the MES owns dispatch and machine state, and production performance crosses as Apache Kafka events.

Often yes. Epicor and SAP S/4HANA carry decades of manufacturing depth in MRP, costing and plant maintenance, and if your processes sit close to their model, buying beats building. A custom ERP earns its place where the differentiating process will not bend — unusual multi-level BOM effectivity, a customer-specific EDI 862 dialect.

By never updating a BOM row in place. Every bill of materials line, routing and work centre in the manufacturing schema carries effective-from and effective-to dates in Drizzle ORM, so a change order inserts a revision rather than overwriting one. Work orders released earlier still resolve to what they were built from.

Yes, including the ones that break first. ERPStack maps ANSI ASC X12 850 Purchase Order, 830 Planning Schedule with Release Capability, 862 Shipping Schedule, 856 Ship Notice/Manifest and 810 Invoice, plus UN/EDIFACT DELFOR for European manufacturing plants. Each interchange is idempotent on its control number, so a re-sent 862 cannot double-book a shipment.

Yes. CBAM under Regulation (EU) 2023/956 reached its definitive regime on 1 January 2026 for cement, iron and steel, aluminium, fertilisers, electricity and hydrogen, so embedded emissions must attach to a consignment, not a company average. Emission factors then hang off the BOM and routing in your manufacturing ERP.

Not in the ledger. High-frequency OPC UA (IEC 62541) and MQTT Sparkplug B tags belong in TimescaleDB, not the transactional PostgreSQL tables: a 1-second tag stream and a financial write are opposite access patterns, and mixing them is why manufacturing ERP reporting crawls. ERPStack aggregates to shift grain.

Sectors with overlapping obligations

Related reading

Explore Custom ERP Solutions by Location, Industry, and Alternatives

Global Architectures